Pre-Install Checklist
-
Mow Your Lawn
It’s best to mow your lawn a day or two before we begin work, this way you won’t need to mow it for a few days after we are done, allowing the concrete to set.
-
Sprinklers
If the ground is dry and needs watering make sure you do so the night before we arrive, not the day of installation.
Please make sure all sprinklers are turned off the night before installation.
-
Pets
Please make sure all pet waste is removed from the installation area.
-
Outdoors
Make sure the sprinkler system is turned off.
-
Utilities
Most utilities are 4” underground and should not be affected.
-
Day of Installation
On installation day we will need access to a water source.
Access: Please make sure all gates are unlocked and access is granted.
Parking: We may need to block driveway access depending on the neighborhood access. (homes on cul-de-sac)